All Incidents

Search Filter:
Select type to display:
All Icon
Incident Icon
Construction Icon
Conditions Icon
Weather Icon
Special Event Icon
Activity Type Description
Road Condition Oversized Load - on FRCL22/Ann Rd; SR604/North Las Vegas Blvd in Clark County Nevada. The over-sized load will be moving thru the Las Vegas, NV area. Monday June 14th during daylight hours only. Length 179'0"; Height 16'7"; Width 18'2"; Weight 435,000 lbs. Please use caution around slow moving vehicles with pilot car escort.
Current as of: 6/11/2021 9:58:58 PM PDT
Construction Roadwork - on FRCL-23/Oso Blanca Rd in both directions between CCC215 and West Deer Springs Way in North Las Vegas, Clark County Nevada. Road will be closed 24/7 starting February 7th at 9pm until late 2023 for long term improvements. Use other routes
Current as of: 2/5/2021 10:52:07 AM PST
Incident Moving Roadwork - on I-15 in both directions between Sloan and Primm in Clark County Nevada. Lanes will be intermittently closed, from 7pm until 7am nightly, June 13th thru June 18th for road improvements. Use caution around this area and expect delays.
Current as of: 6/10/2021 8:31:10 PM PDT
Construction Overnight Roadwork - on I-15 southbound to Russel Rd westbound in Las Vegas, Clark County Nevada. Right lane of the off ramp will be closed 7pm June 14th until 5am June 15th for westbound lane closures on Russel Rd. Use caution around this area.
Current as of: 6/11/2021 8:16:30 PM PDT
Construction Overnight Roadwork - on I-15 in both directions at Tropical Parkway in North Las Vegas, Clark County Nevada. Road will be closed nightly, June 13th thru June 25th, 7pm until 6am for continued flyover construction. Tropical Pkwy between Range Rd and Nicco Way will also be closed during this time. Use caution around this area or use other routes.
Current as of: 6/11/2021 3:37:08 AM PDT
Construction Overnight Roadwork - on I-15 in both directions between SR-594/Russell Rd and Sahara Ave in Las Vegas, Clark County Nevada. The HOV lanes and left shoulders in both directions will be closed nightly, Monday-Friday starting on June 7th from 8 p.m. until 6 a.m. June 30th to install LED luminaires. Please use caution in the area.
Current as of: 6/4/2021 1:07:00 PM PDT
Construction Roadwork - on I-15 southbound between mile marker 16 (north of Jean) and the Nevada/California State-line in Jean, Clark County Nevada. Lanes will be reduced Monday through Thursday, 2pm until 6am, May 24th until October 21st for road improvements. Reduced speed limit of 55 mph, width limit of 12 ft with no passing. Use caution around this area and expect delays.
Current as of: 5/22/2021 12:07:33 AM PDT
Construction Overnight Roadwork - on I-15 southbound between Jean and Primm in Clark County Nevada. From 6pm to 6am, Monday thru Thursday, May 24th until September 1st, lanes will be reduced to one for road improvements. Use caution around this area and expect delays.
Current as of: 5/21/2021 10:46:13 PM PDT
Construction Roadwork - on I-15 in both directions at Northern CC-215 in North Las Vegas, Clark County Nevada. Lanes and shoulders will be reduced daily until Late 2021 for road improvements. Use caution around this area.
Current as of: 10/11/2020 3:02:13 AM PDT
Construction Roadwork - on I-15 northbound at SR-610/Lamb Blvd in North Las Vegas, Clark County Nevada. Lanes will be reduced 24/7 from 12 PM October 9th 2020 until October 9th 2021 for falsework of bridge construction. There will be width limits of 12 ft and height limits of 16 ft. Detours will be in place. Use caution in the area and/or use other routes.
Current as of: 10/9/2020 11:46:43 AM PDT
Construction Overnight Roadwork - on I-515 southbound to Flamingo Rd in Las Vegas, Clark County Nevada. On and off ramps will be closed 7pm June 15th until 5am June 16th for road improvements. Use alternate routes.
Current as of: 6/12/2021 7:34:37 PM PDT
Construction Overnight Roadwork - on I-580 southbound South Virginia Exit 25 A and the on-ramp northbound from South Virginia US-395 A in Reno Nevada. On and off ramps closed, detours available. Monday night 8 PM to 6 AM. Estimated End Time is 6:00 PM on 06/15/21
Current as of: 6/14/2021 10:59:54 AM PDT
Construction Overnight Roadwork (Minor Delays) - on I-580 South from I-80 to Villanova Bridge in Reno, Washoe County Nevada. Sunday through Friday from 9 PM to 6 AM intermittent lane closures with a reduction in speed to 55 MPH. Consider an alternate route. Estimated End Time is 6:00 AM on 06/18/21
Current as of: 6/13/2021 5:47:33 AM PDT
Construction Overnight Roadwork - on I-580 South at Mill Street on-ramp in Reno, Washoe County Nevada. Sunday 6/6/21 9 PM through Monday 6/21/21 6 AM, ramp closure with detour available. Ramp closure will be 24 hours a day, 7 days a week. Consider an alternate route. Estimated End Time is 6:00 AM on 06/21/21
Current as of: 6/5/2021 7:37:07 AM PDT
Construction Roadwork - on I-580 South at I-580 Exit 34 - Mill Street in Washoe County Nevada. Mill Street on ramp will be closed from 9:00 PM Sunday, June 6th through 6:00 AM Monday, June 21st. Detours for south bound I-580 access will be from 2nd Street. Estimated End Time is 6:00 AM on 06/21/21
Current as of: 6/1/2021 9:05:54 PM PDT
Construction Overnight Roadwork - on I-580 southbound from Exit 35 - E. Second St Glendale Ave to Exit 34 - Mill Street in Reno Nevada. Mill Street and 2nd Street offramps will be closed alternately from 9 PM to 6 AM, Sunday night to Friday morning. Detours will be marked. Estimated End date is 06/30/21
Current as of: 4/18/2021 11:09:45 AM PDT
Construction Roadwork - on I-80 in both directions between Pumpernickel Valley and Valmy in Humboldt County Nevada. Shoulder work. Lanes reduced to one with a width limit of 14 feet and the speed limit reduced to 55 miles per hour. Decrease speed and move over for highway workers and equipment. Estimated End date is 07/30/21
Current as of: 6/10/2021 5:14:42 AM PDT
Construction Overnight Roadwork (Minor Delays) - on I-80 East at Exit 15- US-395/I-580 in Reno, Washoe County Nevada. Sunday through Friday from 9 PM to 6 AM intermittent ramp closures with detours in place. Consider an alternate route. Estimated End Time is 6:00 AM on 06/18/21
Current as of: 6/10/2021 3:51:09 AM PDT
Construction Roadwork - on I-80 West at Exit 119 - Oreana Rochester in Pershing County Nevada. Friday through Monday from 6 AM to 7 PM ramp closures in place. Consider an alternate route. Estimated End Time is 7:00 PM on 06/14/21
Current as of: 6/10/2021 3:47:38 AM PDT
Construction Roadwork - on I-80 in both directions between Exit 321 - Halleck / SR-229 and Exit 328 - River Ranch in Elko County Nevada. 24 hour lane closures with the speed limit reduced to 55 miles per hour with delays of up to 10 minutes. There is a 14 foot width limit and periodic on and off ramp closures with flaggers. Decrease speed and move over for highway workers and equipment.
Current as of: 6/4/2021 5:34:51 PM PDT
Construction Roadwork (Minor Delays) - on I-80 in both directions at I-80 Exit 129 - Rye Patch Dam in Pershing County Nevada. Single lane traffic with maximum width of 16 feet. Estimated End date is 07/30/21
Current as of: 5/24/2021 12:53:36 PM PDT
Construction Roadwork (Minor Delays) - on I-80 in both directions from I-80 Exit 112 - Coal Canyon to I-80 Exit 138 - Humboldt in Pershing County Nevada. Single lane traffic from 6 AM to 6 PM, Monday through Friday. Maximum width restricted to 16 feet. Estimated End date is 09/01/21
Current as of: 5/19/2021 12:26:26 PM PDT
Construction Roadwork - on I-80 East from mile marker 114 to mile marker 140 in Pershing County Nevada. Reduced to one lane and 55 miles per hour. Width limit 16 feet. Up to 10 minutes delay possible. Work zone will be 5 miles at a time. Estimated End date is 09/01/21
Current as of: 5/14/2021 8:57:39 AM PDT
Construction Truck Restrictions - on I-80 East to I-580 South Ramp in Reno, Washoe County Nevada. Beginning on 4/29/21 to 12/31/21 oversize vehicles will be limited to 67' in length and 10' in width. Consider an alternate route. Estimated End date is 12/31/21
Current as of: 4/29/2021 9:56:58 PM PDT
Construction Truck Restrictions - on I-80 East to US-395 North Ramp in Reno, Washoe County Nevada. Beginning on 4/29/21 to 12/31/21 oversize vehicles will be limited to 67' in length and 10' in width. Consider an alternate route. Estimated End date is 12/31/21
Current as of: 4/29/2021 9:51:58 PM PDT
Construction Roadwork - on I-80 in both directions from Exit 298 to Exit 303 in Elko Nevada. Continuous 24 hour work zone with single lane travel, no passing, 14 foot width limit, and intermittent on and off ramp closures. Speed reduced to 55 miles per hour with an expected 10 minute delay.
Current as of: 4/22/2021 8:01:51 AM PDT
Construction Utility Work - on I-80 in both directions at Beowawe Rest Area in Eureka County Nevada. Rest Area Closed Indefinitely. No Parking Permitted.
Current as of: 4/19/2021 9:08:36 AM PDT
Construction Roadwork - on I-80 in both directions from Mile marker 266 to Mile Marker 276 in Eureka County Nevada. Continuous Lane closures in each direction, speed limit reduced to 55 with a 10 minute expected delay. Lanes are limited to 14 feet and no passing is permitted. Move over and slow for highway workers and equipment.
Current as of: 3/31/2021 8:17:36 AM PDT
Construction Roadwork - on I-80 in both directions at I-80 Exit 138 - Humboldt in Pershing County Nevada. Underpass of Exit 138 will be reduced to 1 lane and under flagger control, delays of up to 10 minutes can be expected. A height restriction of 14 feet will be in effect at all times. Estimated End date is 06/30/21
Current as of: 3/30/2021 8:04:03 AM PDT
Construction Roadwork - on I-80 in both directions at I-80 Exit 138 - Humboldt in Pershing County Nevada. travel lane with work occurring will be closed off restricting the bridge to one lane with a maximum width of 16 feet. Wide loads greater than 16 feet and less than 21 feet should bypass the work zone using exit 138 and the corresponding on ramp. Minimal delays can be expected. Estimated End date is 06/30/21
Current as of: 3/30/2021 7:56:16 AM PDT
Construction Roadwork (Minor Delays) - on Mill Street in both directions between Kietzke Lane and Greg Street in Reno, Washoe County Nevada. Intermittent east and west bound lane closures from 7 AM to 4 PM and 9 PM to 6 AM. Business access remains available. Estimated End date is 06/30/21
Current as of: 3/30/2021 9:04:25 PM PDT
Construction Roadwork (New Traffic Pattern) - on Robb Drive at I-80 in Reno Nevada. Various lane closures with flaggers from 10 AM to 7 PM, Monday through Friday. Estimated End date is 06/22/21
Current as of: 6/22/2020 3:16:23 PM PDT
Construction Roadwork - on SR-140 in both directions 10 miles of Oregon State Line in Humboldt County Nevada. Beginning on June 2 at 6 a.m., single lane traffic with flaggers and pilot car, 14 foot width limit, speed reduced to 55 miles per hour. Motorists can expect up to 30 minute delays.
Current as of: 5/26/2021 6:05:08 AM PDT
Construction Overnight Roadwork (Utility Work) - on SR-159/Charleston Blvd in both directions between US-95 and Marion Drive in Las Vegas, Clark County Nevada. Lane restrictions with flaggers nightly from 9pm to 5am May 23rd thru June 30th, left and right turn lanes closed for road and utility work. No oversize permits. Use caution around this area or use alternate routes.
Current as of: 5/20/2021 9:01:05 PM PDT
Construction Roadwork (Utility Work) - on SR-227 South from Mile Post 3.8 to Mile Post 13.5 in Elko County Nevada. Mondays through Fridays, 7 a.m. to 5 p.m.; Stay Alert for Workers and equipment on the Shoulder.
Current as of: 5/27/2021 10:18:58 AM PDT
Road Condition Holding Traffic (Race) - on SR-227 in both directions from Pleasant Valley Road to Bartlett Drive in Elko County Nevada. On Saturday, June 19, 2021 from 6:00am to 8:00pm. Bicycles on road. Please use caution in area and expect traffic delays.
Current as of: 6/12/2021 6:04:08 AM PDT
Road Condition Holding Traffic (Race) - on SR-229 North from SR-767 to Fort Halleck Road in Elko County Nevada. On Saturday, June 19, 2021 from 6:00am to 8:00pm. Bicycles on road. Please use caution in area and expect traffic delays.
Current as of: 6/12/2021 6:04:08 AM PDT
Construction Roadwork (Major Delays) - on SR-278 North from mile marker 40.0 to mile marker 71.0 in Eureka County Nevada. Beginning Monday, June 14, 2021 through Friday, June 18, 2021, 7:00am through 7:00pm, crews will be conducting roadway maintenance with routing to opposing lanes via a pilot car escort. Please expect traffic delays and move over for maintenance workers on the highway. Estimated End Time is 7:00 PM on 06/18/21
Current as of: 6/9/2021 9:00:56 AM PDT
Construction Moving Roadwork - on SR-305 in both directions from Mile Post 39 to Mile Post 85 in Lander County Nevada. Mondays through Fridays, 7 a.m. and 5: 30 p.m. there will be shoulder work. Stay Alert, decrease speed and move over for highway workers. Estimated End date is 06/30/21
Current as of: 5/27/2021 10:09:32 AM PDT
Construction Roadwork (Minor Delays) - on SR-396 (Upper Valley Road) in both directions between Union Road and Old Pit Dam Road in Pershing County Nevada. Monday from 6 AM to 5 PM single lane closure with flaggers. Estimated End Time is 5:00 PM on 06/14/21
Current as of: 6/13/2021 11:26:40 AM PDT
Construction Bridge Work (Minor Delays) - on SR-401 in both directions at Rye Patch Dam Structure in Pershing County Nevada. Monday through Friday from 7 AM to 5 PM single lane traffic with a width limit of 12 feet. Estimated End Time is 5:00 PM on 06/18/21
Current as of: 6/13/2021 10:01:22 AM PDT
Construction Roadwork (Minor Delays) - on SR-401 in both directions at I-80 Exit 129 Rye Patch in Pershing County Nevada. Reduced to 1 lane and under flagger control, delays of up to 10 minutes can be expected. Height restriction 14 feet at all times. Estimated End date is 07/30/21
Current as of: 5/24/2021 12:45:11 PM PDT
Construction Roadwork (Minor Delays) - on SR-431 in both directions from SR-28 to Mount Rose Summit in Washoe County Nevada. Single lane closure and speed reduced to 35 miles per hour. Commercial trucks with air brakes traveling westbound are prohibited. Width Limit 14 feet. 30 minutes delay possible. Estimated End date is 10/28/21
Current as of: 5/13/2021 8:27:52 AM PDT
Construction Roadwork (Minor Delays) - on SR-439 in both directions from Pittsburgh Avenue to Italy Drive in Storey County Nevada. Single lane closure both directions during blasting only. Event dates are 6/1/21, 6/3/21, 6/8/21, 6/10/21, and 6/15/21. Estimated End Time is 3:00 PM on 06/15/21
Current as of: 6/2/2021 7:58:47 PM PDT
Construction Roadwork (Minor Delays) - on SR-447 in both directions between Mile Post 25 and Mile Post 36 in Washoe County Nevada. Wednesday from 5:30 AM to 7 PM, single lane closure with flaggers and a width limit of 14 feet. Delays up to 30 minutes expected. Estimated End Time is 7:00 PM on 06/16/21
Current as of: 6/13/2021 11:56:34 AM PDT
Construction Minor Delays - on SR-574/Cheyenne Ave in both directions at Decatur Blvd in North Las Vegas, Clark County Nevada. Turn lanes to southbound Decatur Blvd closed June 14th thru July 7th for the Decatur Blvd 24/7 closure. Use caution around this area and expect delays.
Current as of: 6/11/2021 8:49:26 PM PDT
Construction Minor Delays - on SR-599/Rancho Dr in both directions at Decatur Blvd in North Las Vegas, Clark County Nevada. Turn lanes to northbound Decatur Blvd closed June 14th thru July 7th for the Decatur Blvd 24/7 closure. Use caution around this area and expect delays.
Current as of: 6/11/2021 8:52:00 PM PDT
Construction Roadwork - on SR-612/Nellis Blvd in both directions between Tropicana and Craig in Las Vegas, Clark County Nevada. Lanes reduced to one lane nightly from 8 pm to 6 am and 2 lanes open during daylight hours 24/7 from November 9th 2020 thru June 30th 2022 for continued improvements. Use caution in the area and/or use other routes and expect delays.
Current as of: 11/6/2020 1:45:06 PM PST
Construction Roadwork (Minor Delays) - on SR-648 East 2nd Street between Kietzke Lane and Galletti Way in Reno Nevada. Intermittent lane closures Sunday nights, weekdays 7 AM to 4 PM and week nights 9 PM to 6 AM. Business access will remain available during work hours. Estimated End date is 06/30/21
Current as of: 3/31/2021 4:44:00 AM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-659 in both directions from West 4th Street to South Virginia Street in Reno, Washoe County Nevada. Beginning on 3/14/21 to 7/20/21 from 7 PM to 6 AM single lane closures with flaggers. Consider an alternate route. Estimated End date is 07/20/21
Current as of: 3/14/2021 6:58:27 PM PDT
Construction Roadwork (Minor Delays) - on SR-667 in both directions between East 2nd Street/Glendale Avenue and Galletti Way in Reno, Washoe County Nevada. Beginning on 6/13/21 at 9 PM to 07/14/21 at 9 PM single lane closure in place. Closure will be for 24 hours a day, 7 days a week. Consider an alternate route. Estimated End date is 07/14/21
Current as of: 6/10/2021 3:33:13 AM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-667 in both directions between East Second Street/Glendale Avenue and Galletti Way in Reno, Washoe County Nevada. Beginning on 2/21/21 to 6/30/21 from 9 PM to 6 AM, Kietzke Lane between East Second Street/Glendale Avenue and Galletti Way will have intermittent nightly north bound and south bound single lane closures at the I-580 underpass. Consider an alternate route. Estimated End date is 06/30/21
Current as of: 2/18/2021 10:39:59 PM PST
Road Condition Holding Traffic (Race) - on SR-767 North from Harrison Pass to SR-229 in Elko County Nevada. On Saturday, June 19, 2021 from 6:00am to 8:00pm. Bicycles on road. Please use caution in area and expect traffic delays.
Current as of: 6/12/2021 6:04:08 AM PDT
Construction Bridge Work (Minor Delays) - on SR-856 in both directions between 14th Street and I-80 in Pershing County Nevada. Monday through Friday from 7 AM to 5 PM single lane traffic with flaggers. Width limit is 16 feet. Estimated End Time is 5:00 PM on 06/18/21
Current as of: 6/13/2021 9:55:09 AM PDT
Construction Roadwork (Minor Delays) - on US-50 in both directions between Mile Post 42 and Mile Post 54 in Churchill County Nevada. Monday through Friday from 7 AM to 5 PM single lane traffic with flaggers. Delays up to 30 minutes expected. Estimated End Time is 5:00 PM on 06/18/21
Current as of: 6/13/2021 10:30:04 AM PDT
Construction Roadwork (Utility Work) - on US-50 from Ogden Avenue to Veteran's Boulevard (US6) in Ely, White Pine County Nevada. Lanes are reduced to one, with the use of flaggers, routing to opposing lanes, a vehicle width limit of 12 feet, and a length limit of 100 feet. Please use caution and slow down for highway workers and equipment. Estimated End date is 10/29/21
Current as of: 4/26/2021 2:26:11 PM PDT
Construction Roadwork - on US-6 in both directions between MM 112 and MM 75 in Nye County Nevada. From 5am to 10pm, Monday thru Saturday, May 24th until June 25th, road reduced to one lane with flaggers and pilot cars for road improvements. No oversize permits. No passing. Width limit: 13'. Speed limit: 55mph. Use caution around this area and expect delays.
Current as of: 5/21/2021 10:24:28 PM PDT
Incident Crash - on US-93 at mile post 89 south of Shellbourne Rest Area in White Pine County Nevada. Expect delay, decrease speed, and move over for emergency personnel and equipment.
Current as of: 6/14/2021 9:53:04 AM PDT
Construction Roadwork - on US-93 North from Mile post 101 to Mile post 108 in Elko County Nevada. Expect the use of pilot cars and flaggers, and a travel delay up to 30 minutes. Speed reduced to 55 miles per hour, with a vehicle width limit of 14 feet. Use Caution Around Highway Workers and Equipment. Estimated End date is 08/01/21
Current as of: 5/18/2021 12:05:00 PM PDT
Construction Roadwork (Utility Work) - on US-93 in both directions between 11th street and Great Basin Highway in Ely, White Pine County Nevada. Continuous Lane closures with flaggers. 12 foot Width limit and 100 foot length limit. Expect delays. Move over and slow around construction workers and equipment. Estimated End date is 10/29/21
Current as of: 5/15/2021 5:59:13 PM PDT
Road Condition Oversized Load travelling along US-93, I-11, I-215 Southern, FRCL39/Durango Dr, US-95, US-6/95, US-95, SR-361/Gabbs Valley Rd in Clark County; Nye County; Esmeralda County; Mineral County Nevada. The over-sized load will be moving thru the area from the Arizona/Nevada state-line to Lovelock, NV. Tuesday and Wednesday, June 15th and June 16th during daylight hours only. Length 1180; Height 148; Width 180; Weight 227,000 lbs. Please use caution around slow moving vehicles with pilot car escorts.
Current as of: 6/12/2021 11:06:05 PM PDT
Incident Disabled Semi - on US-93A South north of Lages Station in White Pine County Nevada. Expect delay, decrease speed, and move over for emergency personnel and equipment.
Current as of: 6/14/2021 10:16:58 AM PDT
Construction Roadwork (Minor Delays) - on US-95 in both directions between US-50 and Drumm Lane in Churchill County Nevada. Monday through Friday from 6 AM to 5 PM single lane closures with flaggers. Estimated End Time is 5:00 PM on 06/18/21
Current as of: 6/13/2021 10:44:54 AM PDT
Construction Roadwork (Minor Delays) - on US-95 in both directions between Mile Post 0 and Mile Post 16 in Churchill County Nevada. Beginning on 6/14/21 to 7/1/21 from 7 AM to 7 PM, lane closure with flaggers and/or pilot car. Width limit of 14 feet and a reduction in speed to 55 MPH. Delays up to 30 minutes expected. Estimated End Time is 7:00 PM on 07/01/21
Current as of: 6/13/2021 10:25:43 AM PDT
Construction Roadwork (Minor Delays) - on US-95 in both directions from US-95A to Mineral/Lyon County Line in Mineral County Nevada. Beginning on 6/14/21 to 7/1/21 from 7 AM to 7 PM, lane closure with flaggers and/or pilot car. Width limit of 14 feet and a reduction in speed to 55 MPH. Delays up to 30 minutes expected. Estimated End Time is 7:00 PM on 07/01/21
Current as of: 6/13/2021 10:24:19 AM PDT
Construction Roadwork (Minor Delays) - on US-95 in both directions between Lyon/Mineral County and Lyon/Churchill County Line in Lyon County Nevada. Beginning on 6/14/21 to 7/1/21 from 7 AM to 7 PM, lane closure with flaggers and/or pilot car. Width limit of 14 feet and a reduction in speed to 55 MPH. Delays up to 30 minutes expected. Estimated End Time is 7:00 PM on 07/01/21
Current as of: 6/13/2021 10:18:37 AM PDT
Construction Overnight Roadwork - on US-95 northbound at SR-592/Flamingo Rd in Las Vegas, Clark County Nevada. On and off ramps will be closed 7pm June 14th until 5am June 15th for road improvements. Use alternate routes.
Current as of: 6/11/2021 7:46:21 PM PDT
Construction Bridge Work - on US-95 southbound to Centennial Center Blvd, Ann Rd, North Rancho Dr. in North Las Vegas, Clark County Nevada. Starting June 8th until August 30,2022 off ramp will have concrete barriers in place 24/7 width limit of 14' for continued Centennial Bowl construction. No Oversized Loads. Please use caution while traveling through the work zone and seek alternate routes.
Current as of: 6/8/2021 8:06:01 PM PDT
Construction Roadwork (Minor Delays) - on US-95 North from Corkill Lane to Miners Road in Churchill County Nevada. Intermittent lane closures with flaggers from 7 AM to 3:30 PM. Estimated End Time is 3:30 PM on 06/30/21
Current as of: 6/2/2021 6:35:47 PM PDT
Construction Roadwork - on US-95 in both directions from Mile Post 0 to Mile Post 73.76 in Humboldt County Nevada. Shoulder work. Stay alert, decrease speed and move over for workers and equipment. Estimated End date is 07/01/21
Current as of: 4/22/2021 7:56:52 AM PDT
Construction Bridge Work - on US-95 northbound to CC-215 eastbound in Las Vegas, Clark County Nevada. The ramp will have concrete barriers in place from January 5th until August 30th with a total width of 14' and height of 16' for bridge false work. No oversized loads and please use caution in the area.
Current as of: 3/19/2021 11:13:24 PM PDT
Construction Roadwork - on US-95 northbound to eastbound CC215 in North Las Vegas, Clark County Nevada. The off ramp will have concrete barriers in place from 6am March 7th until 6am August 30th 24/7 with a total width of 14' and height of 14.6" for bridge false work construction. No oversized loads. Use caution in the area and/or use other routes.
Current as of: 3/19/2021 11:12:25 PM PDT
Construction Minor Delays (Roadwork) - on Vassar Street in both directions from Harvard Way to Terminal Way in Reno Nevada. Intermittent lane closures from 7 AM to 4 PM, Monday through Friday. Estimated End date is 06/30/21
Current as of: 3/28/2021 11:33:51 PM PDT
This page auto-refreshes every 2 minutes.