All Incidents

Search Filter:
Select type to display:
All Icon
Incident Icon
Construction Icon
Conditions Icon
Weather Icon
Special Event Icon
Activity Type Description
Special Event Filming - on FRCL07/Las Vegas Blvd in both directions between Mile Marker 7 and Mile Marker 12 (north of US93) in North Las Vegas, Clark County Nevada. From 4:30pm April 24th until 7am April 25th, Road will be closed to thru traffic, Local businesses will still have access. Use caution around this area and expect delays.
Current as of: 4/20/2021 11:16:41 PM PDT
Construction Roadwork - on FRCL-23/Oso Blanca Rd in both directions between CCC215 and West Deer Springs Way in North Las Vegas, Clark County Nevada. Road will be closed 24/7 starting February 7th at 9pm until late 2023 for long term improvements. Use other routes
Current as of: 2/5/2021 10:52:07 AM PST
Construction Overnight Roadwork - on I-11 in both directions at Paradise Hills in Henderson, Clark County Nevada. Lanes reduced to one from 7pm April 18th thru 6am April 23rd for continued improvements. Use caution in the area.
Current as of: 4/15/2021 12:37:29 PM PDT
Construction Roadwork - on I-11 southbound between SR-564/Lake Mead Pkwy and Wagon Wheel Dr in Henderson, Clark County Nevada. Left lanes will be blocked on March 18th to April 30th from 7pm to 7pm for bridge and pavement repairs. There is a width limit of 11' and speed limit of 55 MPH. Please use caution in the area.
Current as of: 3/15/2021 11:00:08 AM PDT
Construction Roadwork - on I-11 northbound between Wagon Wheel Dr and SR-564/Lake Mead Pkwy in Henderson, Clark County Nevada. Lanes will be reduced daily starting on March 3rd until April 30th from 7pm to 6am for continued improvements. Width reduced to 11' and speed limit reduced to 55 mph. Please use caution in the area and expect delays.
Current as of: 2/28/2021 10:40:36 AM PST
Construction Lane Shift - on I-15 northbound before Nevada/Arizona State-line. (Between mm 121 and mm122) in Mesquite, Clark County Nevada. Lanes will be reduced to 1 lane on April 22nd from 7am until 10am for a Sign installation. Use caution around the work area.
Current as of: 4/21/2021 4:09:59 PM PDT
Construction Overnight Roadwork - on I-15 in both directions at Northern CC-215 in North Las Vegas, Clark County Nevada. I-15 will be closed nightly from 7 p.m. until 6 a.m. starting on April 21st to April 24th for continued road improvements. Please use caution in the work zone and/or use other routes.
Current as of: 4/20/2021 9:19:32 PM PDT
Construction Roadwork - on I-15 in both directions at Northern CC-215 in North Las Vegas, Clark County Nevada. Lanes and shoulders will be reduced daily until Late 2021 for road improvements. Use caution around this area.
Current as of: 10/11/2020 3:02:13 AM PDT
Construction Roadwork - on I-15 northbound at SR-610/Lamb Blvd in North Las Vegas, Clark County Nevada. Lanes will be reduced 24/7 from 12 PM October 9th 2020 until October 9th 2021 for falsework of bridge construction. There will be width limits of 12 ft and height limits of 16 ft. Detours will be in place. Use caution in the area and/or use other routes.
Current as of: 10/9/2020 11:46:43 AM PDT
Construction Overnight Roadwork - on I-580 southbound from Exit 35 - E. Second St Glendale Ave to Exit 34 - Mill Street in Reno Nevada. Mill Street and 2nd Street offramps will be closed alternately from 9 PM to 6 AM, Sunday night to Friday morning. Detours will be marked. Estimated End date is 06/30/21
Current as of: 4/18/2021 11:09:45 AM PDT
Construction Overnight Roadwork (Minor Delays) - on I-580 southbound from the I-80 Interchange to Plumb Exit 33 in Reno Nevada. Intermittent lane closure nightly, Sunday thru Friday 9 PM to 6 AM. Estimated End Time is 6:00 AM on 04/23/21
Current as of: 4/18/2021 11:01:40 AM PDT
Construction Roadwork (Overnight Roadwork) - on I-80 East from Exit 22 Lockwood to Exit 23 Mustang in Washoe County Nevada. Left lane closure. Night time work. Estimated End Time is 4:00 AM on 04/22/21
Current as of: 4/19/2021 10:30:26 AM PDT
Construction Utility Work - on I-80 in both directions at Beowawe Rest Area in Eureka County Nevada. Rest Area Closed Indefinitely. No Parking Permitted.
Current as of: 4/19/2021 9:08:36 AM PDT
Construction Roadwork (Minor Delays) - on I-80 East from Exit 32 USA Parkway to Exit 43 Wadsworth in Washoe County Nevada. Traffic will be reduced to 55 miles per hour and a single Eastbound I80 lane, alternating lane closures, at various locations. Nightly work. Estimated End Time is 5:00 AM on 04/23/21
Current as of: 4/19/2021 8:05:53 AM PDT
Construction Roadwork - on I-80 in both directions from Mile Marker 309 to Mile Marker 312 in Elko County Nevada. 24 hour lane closures with the speed limit reduced to 55 miles per hour with delays of up to 10 minutes. There is a 14 foot width limit and periodic on and off ramp closures with flaggers. Decrease speed and move over for highway workers and equipment.
Current as of: 4/15/2021 9:10:16 AM PDT
Construction Roadwork - on I-80 in both directions from Exit 298 to Exit 303 in Elko Nevada. Continuous 24/7 single lane closures with no passing, 14 foot width limit, and intermittent on and off ramp closures. Speed reduced to 55 miles per hour with an expected 10 minute delay.
Current as of: 4/15/2021 9:08:26 AM PDT
Construction Utility Work - on I-80 in both directions at Valmy Rest Area in Humboldt County Nevada. Rest Area Closed indefinitely. No parking permitted.
Current as of: 3/31/2021 8:17:47 AM PDT
Construction Roadwork - on I-80 in both directions from Mile marker 266 to Mile Marker 276 in Eureka County Nevada. Continuous Lane closures in each direction, speed limit reduced to 55 with a 10 minute expected delay. Lanes are limited to 14 feet and no passing is permitted. Move over and slow for highway workers and equipment.
Current as of: 3/31/2021 8:17:36 AM PDT
Construction Roadwork - on I-80 in both directions at I-80 Exit 138 - Humboldt in Pershing County Nevada. Underpass of Exit 138 will be reduced to 1 lane and under flagger control, delays of up to 10 minutes can be expected. A height restriction of 14 feet will be in effect at all times. Estimated End date is 06/30/21
Current as of: 3/30/2021 8:04:03 AM PDT
Construction Roadwork - on I-80 in both directions at I-80 Exit 138 - Humboldt in Pershing County Nevada. travel lane with work occurring will be closed off restricting the bridge to one lane with a maximum width of 16 feet. Wide loads greater than 16 feet and less than 21 feet should bypass the work zone using exit 138 and the corresponding on ramp. Minimal delays can be expected. Estimated End date is 06/30/21
Current as of: 3/30/2021 7:56:16 AM PDT
Construction Minor Delays (Roadwork) - on I-80 in both directions at Exit 129 Rye Patch in Pershing County Nevada. Travel lane with work occurring will be closed off with portable barrier rail restricting the bridge to 1 lane of through traffic. Estimated End date is 05/16/21
Current as of: 3/10/2021 7:46:50 PM PST
Construction Roadwork (Minor Delays) - on Mill Street in both directions between Kietzke Lane and Greg Street in Reno, Washoe County Nevada. Intermittent east and west bound lane closures from 7 AM to 4 PM and 9 PM to 6 AM. Business access remains available. Estimated End date is 06/30/21
Current as of: 3/30/2021 9:04:25 PM PDT
Construction Roadwork (New Traffic Pattern) - on Robb Drive at I-80 in Reno Nevada. Various lane closures with flaggers from 10 AM to 7 PM, Monday through Friday. Estimated End date is 06/22/21
Current as of: 6/22/2020 3:16:23 PM PDT
Construction Roadwork (Minor Delays) - on SR-121 Dixie Valley Road from US-50 to mile post 27 in Churchill County Nevada. Single lane traffic with flaggers and pilot vehicle, Moday thru Friday 7 AM to 4 PM. Lane width 8 feet, no oversize loads. Estimated End Time is 4:00 PM on 05/07/21
Current as of: 4/10/2021 6:42:21 AM PDT
Construction Roadwork - on SR-140 in both directions from milepost 76 to milepost 100 in Humboldt County Nevada. Lanes reduced to one, with routing to opposing lanes, pilot cars and flaggers. Use caution and slow down for highway workers and equipment. Estimated End Time is 4:00 PM on 04/29/21
Current as of: 4/6/2021 6:34:42 AM PDT
Construction Moving Roadwork - on SR-146/St. Rose Pkwy westbound between Southern I-215 and I-15 in Henderson, Clark County Nevada. Lanes will be reduced with intermittent turn lane closures and no passing. Daily from 6am until 2:30pm, April 6th through April 29th for road improvements. Use caution around this area.
Current as of: 4/4/2021 12:31:50 AM PDT
Construction Roadwork - on SR-227 South at Errecart Blvd. in Elko County Nevada. Use Caution. Decrease Speed and Move Over for equipment and workers on the shoulder Estimated End Time is 5:00 PM on 05/06/21
Current as of: 4/15/2021 9:06:54 AM PDT
Road Condition Road Closed - on SR-231 from National Forest Boundary to Angel Lake in Nevada. Estimated time of reopening is Memorial Day weekend. Estimated End date is 05/31/21
Current as of: 3/22/2021 6:17:37 AM PDT
Construction Roadwork - on SR-293 in both directions from Mile Post 6 to Mile Post 12 in Humboldt County Nevada. Beginning Daily at 6AM. Flaggers Will Be in Place Routing Traffic to Opposing Lanes. Use Caution. Decrease Speed and Move Over for Highway Personnel and Equipment. Estimated End Time is 5:00 PM on 04/30/21
Current as of: 4/19/2021 7:36:14 AM PDT
Road Condition Oversized Load - on SR-318 South from US-6 to Mile Post 43.64 in Nevada. During the Daylight Hours on April 23rd. Use Caution Around Pilot Car and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 04/23/21
Current as of: 4/22/2021 2:58:59 AM PDT
Construction Roadwork - on SR-396 in both directions from 14th street to Coal Canyon Road in Pershing County Nevada. Road closed in both directions for the duration of the project. Detours on I-80. Estimated End date is 06/11/21
Current as of: 1/5/2021 7:47:23 PM PST
Construction Roadwork (Minor Delays) - on SR-401 in both directions at I-80 Exit 129 Rye Patch in Pershing County Nevada. Reduced to 1 lane and under flagger control, delays of up to 10 minutes can be expected. Height restriction 14 feet at all times. Estimated End date is 06/04/21
Current as of: 2/24/2021 12:25:04 PM PST
Construction Roadwork - on SR-443 in both directions from sixth street to seventh street in Washoe County Nevada. Lane closures for reconstruction of SR-443 and 7th St intersection on RTC Sun Valley project. Estimated End date is 04/30/21
Current as of: 3/3/2021 10:36:37 AM PST
Construction Roadwork - on SR-612/Nellis Blvd in both directions between Tropicana and Craig in Las Vegas, Clark County Nevada. Lanes reduced to one lane nightly from 8 pm to 6 am and 2 lanes open during daylight hours 24/7 from November 9th 2020 thru June 30th 2022 for continued improvements. Use caution in the area and/or use other routes and expect delays.
Current as of: 11/6/2020 1:45:06 PM PST
Construction Roadwork (Minor Delays) - on SR-648 East 2nd Street between Kietzke Lane and Galletti Way in Reno Nevada. Intermittent lane closures Sunday nights, weekdays 7 AM to 4 PM and week nights 9 PM to 6 AM. Business access will remain available during work hours. Estimated End date is 06/30/21
Current as of: 3/31/2021 4:44:00 AM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-659 in both directions from West 4th Street to South Virginia Street in Reno, Washoe County Nevada. Beginning on 3/14/21 to 7/20/21 from 7 PM to 6 AM single lane closures with flaggers. Consider an alternate route. Estimated End date is 07/20/21
Current as of: 3/14/2021 6:58:27 PM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-667 in both directions between East Second Street/Glendale Avenue and Galletti Way in Reno, Washoe County Nevada. Beginning on 2/21/21 to 6/30/21 from 9 PM to 6 AM, Kietzke Lane between East Second Street/Glendale Avenue and Galletti Way will have intermittent nightly north bound and south bound single lane closures at the I-580 underpass. Consider an alternate route. Estimated End date is 06/30/21
Current as of: 2/18/2021 10:39:59 PM PST
Construction Overnight Roadwork (Minor Delays) - on SR-667(Kietzke Lane) in both directions between Kuenzli Lane and Galletti Way in Washoe County Nevada. Sunday through Saturday nightly lane closures in place with detours available. Estimated End Time is 6:00 AM on 05/01/21
Current as of: 4/21/2021 7:04:58 PM PDT
Construction Overnight Roadwork - on Tropical Pkwy in both directions between Nicco Way and Range Rd in North Las Vegas, Clark County Nevada. Road will be closed nightly from 7 p.m. until 6 a.m. starting on April 21st to April 24th for continued road improvements. Please use caution in the work zone and/or use other routes.
Current as of: 4/20/2021 9:55:07 PM PDT
Construction Roadwork - on US-395 in both directions from US-395 Exit 71 - Parr Blvd Dandini Blvd to Panther Valley Exit 72 in Washoe County Nevada. Temporary Lane Closures with traffic control, not to exceed 30 minutes each. Estimated End Time is 5:00 AM on 04/22/21
Current as of: 4/16/2021 4:37:10 PM PDT
Construction Overnight Roadwork - on US-50 in both directions from Stateline to Lake Parkway in Douglas County Nevada. Intermittent lane closures nightly, Monday thru Thursday 7 PM to 6 AM. Estimated End Time is 6:00 AM on 04/22/21
Current as of: 4/17/2021 1:49:29 AM PDT
Construction Roadwork (Utility Work) - on US-50 from Ogden Avenue to Veteran's Boulevard (US6) in Ely, White Pine County Nevada. Lanes are reduced to one, with the use of flaggers, routing to opposing lanes, a vehicle width limit of 12 feet, and a length limit of 100 feet. Please use caution and slow down for highway workers and equipment. Estimated End date is 10/29/21
Current as of: 3/25/2021 12:03:50 PM PDT
Road Condition Oversized Load - on US-6 East from Mile Post 112 to SR-318 in Nevada. During the Daylight Hours on April 23rd. Use Caution Around Pilot Car and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 04/23/21
Current as of: 4/22/2021 2:58:37 AM PDT
Road Condition Oversized Load traveling on US-6; US-6/95; US-6; SR 318/Sunnyside Rd; SR 604/North Las Vegas Blvd in Mineral County, Esmeralda County, Nye County, and Clark County. The over-sized load will be moving thru the area from the California/Nevada State-line to North Las Vegas, Nevada. Friday, April 23rd during day light hours only. Load Dimension: Length - 128'1"; Height - 18' 9"; Width - 24'0"; Weight - 247,575 lbs. Please use caution around slow-moving vehicles with pilot car escort.
Current as of: 4/21/2021 10:35:47 PM PDT
Construction Roadwork - on US-93 North from Mile post 101 to Mile post 110 in Elko County Nevada. Shoulder work on week days, during the daylight hours only. Speed Reduced to 55 Miles Per Hour. Use Caution Around Highway Workers and Equipment. Estimated End date is 08/01/21
Current as of: 4/16/2021 8:18:46 AM PDT
Construction Roadwork (Utility Work) - on US-93 in both directions between 11th street and Great Basin Highway in Ely, White Pine County Nevada. Continuous Lane closures with flaggers. 12 foot Width limit and 100 foot length limit. Expect delays. Move over and slow around construction workers and equipment. Estimated End date is 10/29/21
Current as of: 4/15/2021 9:14:42 AM PDT
Weather Wind Alert - High Profile Vehicles Not Advised (Crosswinds) - I-11/US-93 in both directions on Hoover Bypass Bridge in Boulder City, Clark County Nevada.
Current as of: 4/21/2021 10:54:04 AM PDT
Construction Overnight Roadwork - on US-95 southbound to Centennial Center Blvd, Ann Rd, and Rancho Dr. in North Las Vegas, Clark County Nevada. From 9pm April 22nd until 5am April 23rd, the off ramp will be closed for continued Centennial Bowl construction. Please use caution while traveling through the work zone and seek alternate routes.
Current as of: 4/20/2021 8:34:30 PM PDT
Construction Roadwork (Minor Delays) - on US-95 in both directions from mile marker 6 to mile marker 16 in Churchill County Nevada. Single lane traffic with flaggers and pilot vehicle, 7 days a week 4 AM to 7 PM. Lane width 14 feet, speed reduced to 55 miles per hour. Estimated End Time is 7:00 PM on 04/30/21
Current as of: 4/17/2021 1:40:25 AM PDT
Construction Roadwork - on US-95 in both directions from Mile Post 0 to Mile Post 73.76 in Humboldt County Nevada. Shoulder work. Decrease Speed and Move Over for Workers and Equipment. Estimated End date is 07/01/21
Current as of: 3/25/2021 12:25:23 PM PDT
Construction Bridge Work - on US-95 northbound to CC-215 eastbound in Las Vegas, Clark County Nevada. The ramp will have concrete barriers in place from January 5th until August 30th with a total width of 14' and height of 16' for bridge false work. No oversized loads and please use caution in the area.
Current as of: 3/19/2021 11:13:24 PM PDT
Construction Roadwork - on US-95 northbound to eastbound CC215 in North Las Vegas, Clark County Nevada. The off ramp will have concrete barriers in place from 6am March 7th until 6am August 30th 24/7 with a total width of 14' and height of 14.6" for bridge false work construction. No oversized loads. Use caution in the area and/or use other routes.
Current as of: 3/19/2021 11:12:25 PM PDT
Construction Roadwork - on US-95 in both directions between MM 72 and MM 104 in Beatty, Nye County Nevada. Traffic will be routed to opposing lanes 24/7 Monday -Friday from 6 pm November 30th 2020 thru May 20th 2021 for continued improvements. Lane widths reduced to 12' with reduced speed limit of 55 mph. Follow flaggers and pilot car escorts. Use caution in the area and expect delays.
Current as of: 3/11/2021 10:19:18 AM PST
Construction Roadwork - on US-95 northbound between MM 72 and MM 104 in Beatty, Nye County Nevada. Daily 6 am to 4 pm, September 15th thru April 2021 for continued improvements. there will be flaggers and pilot car escorts. Expect delays and use caution in the area.
Current as of: 10/9/2020 12:24:08 PM PDT
Road Condition Road Closed - on US-95 from mile post 87.0 in Mineral County to mile post 2.3 in Churchill County in Nevada. Closure begins Monday 7 AM thru April 29th at 7 AM. Detour available and signed. Estimated End Time is 7:00 AM on 04/29/21
Current as of: 4/19/2021 6:39:20 AM PDT
Construction Minor Delays (Roadwork) - on Vassar Street in both directions from Harvard Way to Terminal Way in Reno Nevada. Intermittent lane closures from 7 AM to 4 PM, Monday through Friday. Estimated End date is 06/30/21
Current as of: 3/28/2021 11:33:51 PM PDT
This page auto-refreshes every 2 minutes.